
Alhambra Parc
33 Alhambra Circle, Coral Gables, FL 33134
$1,000,000 - $3,000,000
Documents
- Developer
- MG Developer
- Architect
- Bellin & Pratt Architects
- Interior design
- N/A
- Completion
- 2028
- Residences
- 78 units
- Height
- 9 floors
- Sizes
- From 990ft² - 5,536ft²
The residence
Located within walking distance of Miracle Mile and Giralda Avenue, Alhambra Parc offers effortless access to the finest dining, boutique shopping, and cultural experiences. Inspired by a 1930s historic home, Alhambra Parc pays homage to the city’s storied past while delivering modern luxury at its finest. Designed by a celebrated architect, Bellin-Pratt Fuentes, with a deep connection to the neighborhood, every detail—from the refined finishes to the grand façades—captures the essence of Coral Gables.
Nine levels of redefined living - Alhambra Parc offers private residences from levels 4 to 9, featuring an exclusive lobby for residents, ensuring a boutique living experience. Dedicated corporate spaces are on the 2nd level, providing a setting for executive offices, complete with a private lobby and separate elevator for residents. The ground level offers high-end retail including fine dining, luxury art boutiques, and a pet-friendly, private resident park.
Gallery
Amenities and services
Residences Features
- Ceilings up to 10 feet high, creating airy, light-filled spaces that enhance the sense of opennes.
- 7- and 8-foot interior doors, reinforcing a grand, elegant aesthetic.
- Porcelain flooring throughout, offering durability, sophistication.
- Every unit offers several balconies and terraces with breathaking views of the city and beyond.
- Penthouses terraces designed for spectacular rooftop entertaining, featuring expansive outdoor dining areas and spanning up 2,735 sq. ft.
- Spacious balconies on the 4th-floor residences, ranging from 322 to 1,440 sq. ft., offering seamless indoor-outdoor living.
- Balconies in units on the 5th to 8th floor providing great city views.
Payment schedule
- 10% at Reservations
- 10% at Contract (Estimated April 2025)
- 10% at Ground Breaking (Estimated Summer 2025)
- 10% at Top Off
- Balance at Closing (Q4 2027/Q1 2028)